About Hitchcock Building Services
What we do at Hitchcock Building Services
Our Photo Gallery
Our Featured Projects
Our Packages
Our Testimonials
Read what happening in Hitchcock News
Request a Quote

Click to verify BBB accreditation and to see a BBB report.

Bad Contractor Installation Failed After 2 Years


Main Objective:

Tear down entire failed hardscape retaining wall and pavers; to reinstall to manufacturers recommended specifications.

Specific Goals :
  • Install with benefit of Georgrid material
  • Include 1 inch clear gravel backfill for drainage
  • Base-compacted 3/4 inch T.B. compacted
  • Reinforce stair detail
  • Stabilize pillars and aluminum fence
  • Proper pitch of pavers for drainage
  • Low Voltage lighting
Materials Used :
  • Existing keystone country manor for wall, pillars and stairs.
  • Holland stone pavers for patio
Time to Complete :

Tear down = 1 day
Install = 5 days

Hardscape Retaining Wall Replacement

Hardscape Retaining Wall Replacement

Hardscape Retaining Wall Replacement

 

Hardscape Retaining Wall Replacement

Hardscape Retaining Wall Replacement

Hardscape Retaining Wall Replacement

Hardscape Retaining Wall Replacement

Hardscape Retaining Wall Replacement

 

 

Hitchcock Building Services
31 S. Main St., Oconomowoc, WI 53066
PH: 262-271-0574
info@hitchcockservices.com

This Site was created by Orionweb